百分零部件网

登录

五金部件阀门安全阀

A69-Pw5414v DN100主安全阀

供应商:
上海南而阀门有限公司
企业类型:
生产厂家

产品简介

A69-Pw5414v DN100主安全阀

详细信息

SKU:A69-Pw5414v DN100主安全阀 (W系列)
Description:

A69-Pw5414V DN100

用途Usage

主要用于电站锅炉、压力容器、减温减压装置等设备,防止压力超过允许zui高压力值,保证设备安全运行。

This valve is used for power plant boilers, pressure containers, pressure and temperature reducing devices and other facilities. It serves
to prevent the pressure from exceeding max. allowable value and ensure the safety of the device during working.

结构简述 Struture briefing

1、阀门为双排汽、两端为法兰连接结构。主要由阀体、阀盖、缓冲容器、活塞室、阀瓣、阀杆等零件组件。
2、当介质压力升高至整定压力时,冲量安全阀打开,介质从脉冲管进入主安全阀的活塞室,推动活塞下降,使阀门自动打开,当冲量阀关闭时,阀瓣又自动关闭。

3、密封面用钴基硬质合金堆焊而成,阀瓣经热处理,提高了硬度。

1. The structure of the valve of double exhaust and both of its ends are connected with flange. It is mainly consisted of boby, bonnet,cushion container, piston chamber, disc, stem and other parts.
2.When the medium pressure rises to the set pressure, the impulse safety valve opens, and the medium in the impulse pipe enters into the piston chamber of the main safety valve from impulse pipe, forcing the piston descend, and then the valve automatically opens; when the impulse safety valve closes, the disc will also automatically close.
3.The sealed surface is made of hard alloy of cobalt by overlaying welding. Through thermal treatment, the hardness of disc is improved.

安装说明 Installation instruction

1、主安全阀门必须垂直安装在设备的zui高位置。
2、主安全阀紧固在支座上,支座承受主安全阀排汽时产生的反作用力。
3、排汽管应有专门吊架,排汽管重量不许加在主安全阀上,主安全阀与排汽管之间的连接法兰应消除任何的附加预应力。

4、排汽管的zui低点应考虑疏水,以免排汽时产生水击。

1. The main safety valve shall be installed vertically at the highest position of the deivce.
2. The main safety valve shall be fastened upon the gallow, Which sustains the counterforce produced in the steam discharging process of the main safety valve.
3. The exhaust pipe shall contain a special gallow to prevent the force of its weight directly applying on the main safety valve. The connecting lange between the main safety valve and exhaust pipe shall eliminate anyextra stress.
4. At the lowest point of the exhaust pipe, water drainage shall be taken into consideration to avoid producing water hammer while discharging steam.